Underground Utilities

January 2009 - September 2009

Indian Memorial Intake Phase 1 Contract 3-3

Mobridge, South Dakota

Underground utility project, Mobridge, South Dakota Underground utility project, Mobridge, South Dakota Underground utility project, Mobridge, South Dakota Underground utility project, Mobridge, South Dakota

Owner Standing Rock Sioux Tribe

Value $4,709,213.78

Engineer Bartlett & West Engineers

  • 34,610 LF of 24" PVC Waterline
  • 500 CY of Excavation
  • 200 SY of Paving
  • 200 LF of Boring 30" Steel Casing
  • Project also involved a large scale Horizontal Directional Drill - 4,721 lineal feet crossing under the Grand River, utilizing 24" C905 Fusible PVC (Underground Solutions).
  • This crossing holds the world record for the longest horizontal directional drill using PVC pipe.

Latest Updates

  • Contact Us

  • 1351 Broadway St W
  • P.O. Box 459
  • Rockville, MN 56369
  • Toll Free 800.243.8720
  • Office 320.253.9291
  • Fax 320.253.3533